Office & commercial
The office move happens overnight. The planning cannot.
After-hours windows, IT that has to come back up by Monday, a floor plan that says which desk goes where, and several crews across a multi-phase relocation. All on one job, costed as one job.
A corporate move is judged on whether Monday works.
An office relocation is not a bigger house move. It runs in a locked-down window after hours, it moves IT that has to power on and log in by the next business day, and it is often phased across several nights and several crews. The client is a facilities manager who signed off a plan and expects the plan to happen. When a desk lands on the wrong floor or a crew turns up to a building they cannot get into, the failure is visible to a whole company. This is a coordination job, and the coordination is the product.
Plan the phases
Several nights, several crews, one plan they signed.
Survey the premises, quote and e-sign against a scope the facilities manager approves, then schedule the crews and trucks across every phase from one board.
Survey and scope, signed off
Survey the premises on site or by video, then quote against a scope the client e-signs. The phased plan everyone agreed to is the record the job runs from, not a proposal in someone's inbox.
Multi-phase scheduling
A relocation across three weekends is one job with several phases, each with its own crews, trucks and after-hours window. The clashes show on the board before a crew is ever double-booked.
Multiple crews, coordinated
Assign and brief every crew across every phase from the dispatch board. The team packing the tenth floor and the team receiving at the new site are working from the same job, not two versions of it.
Run the night
The floor plan is on the crew's phone. The office sees it live.
Crews work the after-hours window in Moveezi Field with the labelling and photos to prove it, while the office watches from the Control Tower and costs the whole job as it runs.
Field work, destination-labelled
The crew runs the move in Moveezi Field: what came off which floor, where it is going, and photos of the condition. It captures offline in a stairwell or a car park and syncs when signal returns.
The office watching overnight
The Control Tower shows every crew and truck on the job live, so a coordinator can supervise a 2am move from one screen instead of a run of phone calls to tired teams.
Costed as one job
Crew hours across every phase, trucks and after-hours loading land against the one job. The margin on a relocation billed over three weekends is a live number, not a month-end reconciliation.
Why it matters
Corporate work is contract work. Deliver the plan and it renews.
A facilities manager buys a plan and a clean Monday, and they buy it again next time if you delivered both. What loses the account is a phase that drifted or a cost you could not explain.